Clean Energy News Roundup, November 24, 2026: Scotland Clears Creca Green Hydrogen Plant as Australia Sets Wind, Solar and Storage Contracts
Scotland clears a green hydrogen plant, Australia fixes the contracts meant to finance new wind, solar and batteries, and India drafts a storage rule for bigger rooftop solar systems.
Three clean energy stories from the past 24 hours worth your time this Tuesday.
Creca green hydrogen plant wins planning consent in Scotland
Dumfries and Galloway Council has approved Green Cat Hydrogen's planning application for the Creca Hydrogen Facility at Chapelcross, near Annan. The site is designed to produce more than 4,000 tonnes of electrolytic hydrogen a year for nearby industry, avoiding up to 26,000 tonnes of CO2 annually, with around 150 construction jobs and 50 permanent roles. Creca is one of three Green Cat projects on the shortlist for the UK's second Hydrogen Allocation Round (HAR2), so with planning settled, the government's subsidy decision becomes the next big hurdle.
Source: Renewable Energy Magazine
Australia settles contract designs to make wind, solar and storage bankable
ASL, the body that runs Australia's federal and state energy tenders, has published working-group term sheets for the new Electricity Services Entry Mechanism recommended by the Nelson Review. There are three products: a regional reference PPA for bulk wind and solar energy, a daily block-spread swap that pays storage for shifting energy from cheap hours to expensive ones, and a $600/MWh cap contract for firming capacity. Final details are still open, but the goal is finance: many Australian projects have failed to secure the long-term revenue lenders want, and the country now looks likely to miss its 82% renewables target for 2030.
Source: RenewEconomy
India proposes a battery requirement for larger rooftop solar systems
India's Ministry of Power issued draft amendments to its electricity consumer rights rules on November 23, with comments due by December 23 and most changes set for April 1, 2027. The draft would let consumers install renewable systems beyond their own rooftops, keeps net metering, gross metering and net billing open under state rules, and from April 2028 could require storage equal to at least 20% of daily renewable output for systems above a state-set size, with 10 kW proposed as the default. Wider Time-of-Day tariffs in the same package would further push rooftop owners toward pairing panels with batteries.
Source: SolarQuarter
Takeaway: permits, contract design and tariff rules, not technology, decided most of today's headlines on what gets built.
Developing a green hydrogen project of your own? Screen it for free at h2hub.reneenergy.com.
For plain-English explainers on hydrogen and clean energy, subscribe to the ReneEnergy YouTube channel.

Comments