Solar Leases and PPAs in Georgia: What Businesses Can Sign
Last updated November 20, 2026 · By Alex, ReneEnergy
Yes: a solar PPA in Georgia is legal for a business, and so is a solar lease, under Georgia's Solar Power Free-Market Financing Act (O.C.G.A. §§ 46-3-60 to 46-3-66). The catch is size: a third-party-financed commercial system may be no larger than 125% of the site's actual or expected maximum annual peak demand, and it must serve only the premises it sits on. Georgia Power, an EMC or a city utility cannot block the arrangement, but it can still require its safety and interconnection standards.
This guide explains what Georgia law allows, how the main ownership models compare for a Georgia business, and a worked example of when a PPA price saves money and when it does not.
Is a solar PPA legal in Georgia for a business?
Yes. The 2025 Georgia Code defines a "solar energy procurement agreement" as "any agreement, lease, or other arrangement" under which a solar financing agent finances the installation or operation of solar technology and "the payments are based on the performance and output" of the system (O.C.G.A. § 46-3-62, 2025 Code). That covers the classic power purchase agreement (you pay per kWh) and output-based leases.
Three rules in the Act matter most for a commercial site:
It is not treated as selling electricity. If the system stays within the capacity limit, neither the customer nor the financier is considered an "electric supplier," so the deal does not break the exclusive service territories of Georgia Power, the EMCs or city utilities (§ 46-3-65).
The utility cannot interfere. No electric service provider may "prevent or otherwise interfere with" the financing, installation or operation, but it may require safety, power-quality and interconnection compliance. The customer must give the utility at least 30 days' notice before the system starts operating (§ 46-3-63).
One system, one premises. Output from a system serving a premises may only be used there or fed back to the utility. You cannot use a PPA to supply a neighbouring tenant or a second building on another meter (§ 46-3-63).
The Act defines an "electric service provider" as any supplier distributing electricity to retail customers in Georgia (§ 46-3-62), so these rules apply whether your site is served by Georgia Power, one of the state's EMCs or a municipal utility. What each utility pays for exported energy, and its interconnection steps, differ; check your own utility's current rules.
How big can a third-party-owned commercial system be in Georgia?
The cap is 125% of the premises' actual or expected maximum annual peak demand, measured in AC at the meter; for homes the cap is 10 kW AC (§ 46-3-62(2), 2025 Code). "Maximum annual peak demand" means the highest single-hour demand that occurs, or is expected to occur, at the meter.
Two practical consequences:
Pull 12 months of interval or demand data before talking size. A warehouse with a 160 kW peak can host up to 200 kW AC under a PPA or lease. A building that peaks at 60 kW cannot host a 300 kW roof-filling array on a third-party contract, even if the roof would fit it.
The utility's equipment requirements scale with size. For commercial systems up to 100 kW, once the customer or financier supplies equipment meeting the standards, the utility cannot add further safety or performance standards or require extra liability insurance; above that size it may add requirements limited to what is needed to protect public safety and the system (§ 46-3-64).
Our earlier guide to commercial solar interconnection in Georgia walks through the application side.
Cash, loan, lease or PPA: which ownership model fits a Georgia business?
The right model depends mainly on whether your business can use federal tax benefits and how much balance-sheet risk it wants to carry. The table summarises the trade-offs.
Model | Upfront payment by the business | Who owns the system | Who claims federal tax benefits | Who maintains it | Main risk for the business |
Cash purchase | Full system price | Business | Business, if it has tax liability | Business (or an O&M contractor it hires) | Performance and repair costs |
Loan | Down payment, if the lender requires one | Business | Business | Business | Debt payments continue even if output falls |
Lease (fixed or output-based) | Often none | Lessor | Lessor | Usually lessor | Fixed payments may exceed savings |
PPA (pay per kWh) | Often none | Developer/financier | Developer/financier | Developer/financier | Price escalator outpacing utility rates |
These are typical structures, not quotes; your contract terms decide them. A fixed-payment lease that is not tied to output may fall outside the Act's definition above, so ask counsel how a specific contract is classified.
Does the federal tax credit still help a Georgia solar PPA in 2026?
Only if the project meets the new deadlines. IRS Notice 2025-42 states that the Section 48E and 45Y credits terminate for wind and solar facilities placed in service after December 31, 2027 unless construction began by July 4, 2026, and that physical work is now generally the only way to prove construction began (IRS Notice 2025-42). Solar facilities of 1.5 MW AC or less may still use a 5%-of-cost test.
For a PPA, the developer claims the credit, and a credit it can no longer claim usually shows up as a higher price per kWh. The IRS has also issued guidance on "prohibited foreign entity" material-assistance rules for these credits, including for facilities whose construction begins after December 31, 2025 (IRS news release IR-2026-23, February 12, 2026). Ask any provider in writing which credit its price assumes and what happens to the price if the project misses a deadline. Confirm your own position with a tax professional.
When does a PPA price save money in Georgia? A worked example
A PPA saves money only while its price per kWh stays below what each solar kWh actually avoids on your bill. EIA reports that Georgia's average commercial retail price was 10.87¢/kWh in 2024 (EIA, Electric Sales, Revenue and Price, Table 4). We used that as the avoided rate for a hypothetical 200 kW DC warehouse roof.
Illustrative assumptions, not a quote or project data: 1,350 kWh per kW per year, slightly below the roughly 1,430 kWh/kW from our November 19 PVWatts runs for Atlanta, Savannah and Macon at 25° tilt, to allow for a low-tilt flat roof; 270,000 kWh in year 1; 0.5% annual degradation; all output used on site; 20-year term.
PPA price, year 1 (¢/kWh) | PPA escalator (%/yr) | Utility rate growth (%/yr) | Year-1 savings ($) | 20-year savings ($) |
8.0 | 0 | 0 | 7,749 | 147,835 |
8.0 | 2 | 0 | 7,749 | 60,938 |
8.0 | 2 | 2 | 7,749 | 179,009 |
9.5 | 0 | 0 | 3,699 | 70,569 |
9.5 | 2 | 0 | 3,699 | −32,621 |
9.5 | 2 | 2 | 3,699 | 85,450 |
The lesson: the same 9.5¢ PPA that looks fine in year 1 loses money over 20 years if it escalates 2% a year while utility rates stay flat. The escalator, not the starting price, is the term to negotiate hardest.
This example also overstates savings in one important way. The EIA average includes demand and fixed charges, and solar mostly avoids energy charges, not the monthly peak. Our post on commercial solar battery storage in Georgia explains when storage helps with demand charges.
Which Georgia sectors suit a PPA or lease?
Sites with steady daytime load and a large roof but little appetite for tax credits tend to suit third-party ownership best. Under the 125% rule, daytime load also sets the legal ceiling.
Warehouses and distribution centers: big roofs, but lighting-only buildings may have low peaks that cap the system size. Cold storage peaks higher and runs around the clock.
Poultry and other farms: ventilation loads peak on hot afternoons; see our guide to solar for Georgia poultry farms.
Manufacturing: high, steady daytime load supports larger systems; confirm the roof's remaining life before a 20-year contract.
Schools, churches and nonprofits: they pay no income tax, so a PPA lets the owner use credits they cannot. Check board approval and debt covenants, and how a contract would treat summer or weekday-only occupancy.
What should a Georgia business check before signing a solar PPA or lease?
Peak demand and size: the contract size must be within 125% of your maximum annual peak demand (§ 46-3-62).
Price and escalator: model them against flat and rising utility rates, as in the table above.
Production guarantee: what happens if output falls below the estimate, and how it is measured.
Roof and removal: who pays to remove and reinstall panels for a reroof, and roof penetration warranties.
End of term and sale of the building: buyout price, transfer to a new owner, and removal obligations.
Tax-credit assumptions: which credit the price relies on, and what changes if it is lost (Notice 2025-42).
Utility steps: the 30-day notice in § 46-3-63, your utility's interconnection approval and local permits.
Frequently asked questions
Can Georgia Power stop me from signing a solar PPA?
No. Under O.C.G.A. § 46-3-63 no electric service provider may prevent or interfere with a qualifying financing arrangement. Georgia Power, EMCs and city utilities can still require their safety, power-quality and interconnection standards.
Can a Georgia utility offer a solar lease itself?
Yes. The law lets an electric service provider or affiliate act as a solar financing agent, but its existing service-territory restrictions still apply to it (§ 46-3-65).
Can one PPA system supply several buildings?
Not across meters. A property with several premises can host several systems, but each may connect to only one premises, and its output must be used there or exported to the utility (§ 46-3-63).
Is a solar lease or PPA better for a nonprofit in Georgia?
Often a PPA, because the developer can use tax benefits the nonprofit cannot, and the nonprofit pays only for the power. Compare the 20-year PPA cost with buying the system outright, and ask a tax professional which incentives, if any, the organization could use itself.
Assumptions and limits
The worked example uses a statewide average price, not a specific Georgia Power, EMC or city utility rate schedule, and it ignores demand charges, export credits, O&M, insurance and financing costs. Production uses an assumed yield based on our earlier PVWatts runs, not a site-specific model. Statute text was read from Justia (2025 Code) and FindLaw (current as of March 28, 2024); check the official Georgia Code before relying on it. This is not legal, tax, financial, structural or electrical advice. Utility approval, local permits and a licensed contractor are required, and incentives should be confirmed with a tax professional.
More Georgia solar analysis
Keep reading our Georgia series: Commercial Solar Interconnection in Georgia: Step by Step, Commercial Solar Battery Storage in Georgia: When It Pays and Solar for Georgia Poultry Farms: Loads, Roofs and Payback. Browse every post in Going Solar.
Sources
O.C.G.A. § 46-3-62, Definitions (2025 Code of Georgia, via Justia), accessed November 20, 2026.
O.C.G.A. § 46-3-63, Financing of solar technology (FindLaw), accessed November 20, 2026.
O.C.G.A. § 46-3-64, Requirements for retail electric customers (FindLaw), accessed November 20, 2026.
O.C.G.A. § 46-3-65, Electric supplier status (FindLaw), accessed November 20, 2026.
IRS Notice 2025-42, Sections 45Y and 48E beginning of construction, accessed November 20, 2026.
IRS, IR-2026-23, guidance on prohibited foreign entity rules (February 12, 2026), accessed November 20, 2026.
U.S. EIA, 2024 average retail price by state and sector (Table 4), accessed November 20, 2026.
U.S. EIA, Georgia Electricity Profile 2024, accessed November 20, 2026.
Fact-checked November 20, 2026.



Comments