Solar for Churches and Nonprofits in Georgia: Own or PPA?

Last updated November 27, 2026 · By Alex, ReneEnergy
Solar for churches in Georgia can work, but the ownership choice matters as much as the panels: a church or nonprofit that buys its own system can now claim the federal investment credit as a cash payment through IRS elective pay, but only if a project that starts now is placed in service by December 31, 2027. In our illustrative Georgia example, a 30 kW roof on a typical congregation building at an assumed $3.00 per watt pays back in roughly 16 to 18 years with a 30% elective payment and 22 to 26 years without it. A PPA wins only if its price stays below about 8.4 to 9.8 cents per kWh.
This guide covers Georgia Power, EMC and city-utility customers, and explains what each ownership model means for a tax-exempt organization. It is general information, not tax, legal or financial advice.
Can a church or nonprofit in Georgia get the federal solar tax credit?
Yes, through elective pay, if the project meets the current deadlines. IRS Publication 6045 (Rev. 10-2026) names religious organizations and nonprofits among the tax-exempt entities that can use the Section 48 and 48E investment credits, and says projects under 1 MW are worth 30% of the property's basis, with prevailing wage, apprenticeship and domestic content requirements not applying to them. IRS Publication 5817-D says any organization described in Code sections 501 through 530 can make the election.
The catch is timing. The IRS 2025 Instructions for Form 3468 say the 2025 law (P.L. 119-21) ends the Section 48E credit for wind or solar facilities placed in service after 2027 where construction began after July 4, 2026. Construction is shown by the physical work test or, for qualifying cases, the 5% safe harbor. A church starting today therefore needs a system working by December 31, 2027.
Elective pay also has paperwork steps. Publication 5817-D requires pre-filing registration with the IRS, a registration number on the return, and an electronically filed Form 990-T by its due date or extended due date, even for organizations that do not normally file one. Have a tax professional confirm eligibility before signing anything.
Own, borrow, lease or PPA: what can a Georgia nonprofit sign?
All four are legal in Georgia. The state's Solar Power Free-Market Financing Act defines a "solar energy procurement agreement" as any agreement, lease or arrangement where a financing party installs solar and is paid based on the system's output, and caps a non-residential system at 125% of the premises' actual or expected maximum annual peak demand (O.C.G.A. § 46-3-62, FindLaw, current as of March 28, 2024). Our earlier guide to solar leases and PPAs in Georgia covers the rest of the Act.
Ownership model | Who owns the system | Who claims the federal credit | Upfront cost to the organization | Main risk for the organization |
Cash purchase | The church or nonprofit | The organization, via elective pay | Full price, partly returned after filing | Missing the 2027 deadline or a filing step |
Loan | The organization | The organization, via elective pay | Low; repaid over the loan term | Loan payments exceed bill savings in early years |
Lease | A third-party financier | The financier | Usually low | Fixed payments regardless of how much the building uses |
PPA (pay per kWh) | A third-party financier | The financier | Usually none | PPA price rising above the value of each solar kWh |
Elective pay narrowed the old argument for PPAs. Before the 2022 Inflation Reduction Act created elective pay, a tax-exempt owner could not use the credit at all, so letting a developer claim it was often the only way to capture it. Now the organization can claim it directly if it owns the system, which makes owning or borrowing worth pricing alongside any lease or PPA offer.
How much electricity does a Georgia church use, and when?
Less than most commercial buildings, and at unusual times. The EIA's 2018 Commercial Buildings Energy Consumption Survey, Table C22 puts religious worship buildings at a mean of 4.9 kWh of electricity per square foot per year, against 9.1 for K–12 schools and 13.6 for offices. The EIA's religious worship building profile gives an average size of 12,500 square feet.
Timing is the real issue. Many congregations use most of their power on weekends and some evenings, while panels produce on every sunny weekday. Energy produced while the building is quiet is exported, and exports usually earn less than the retail price you avoid. A church with a weekday school, daycare, food pantry or offices will use more of its own solar output. Pull 12 months of bills, and interval data if your utility offers it, before sizing anything.
What does Georgia Power pay for a church's exported solar?
For systems up to 250 kW AC, Georgia Power credits exports at its solar avoided cost rate plus an adder. Its commercial rooftop solar FAQ, checked November 27, 2026, lists the 2025 rate as 3.3153 cents/kWh under RNR-Instantaneous Netting, plus 4 cents/kWh approved in the 2022 rate case. Excess is summed monthly and used to reduce the bill. Systems from 100 to 250 kW AC may not exceed 125% of the prior year's metered peak demand. The program enrolls first come, first served up to a cap of 0.2% of the company's prior-year peak demand. Larger systems go to Energy Offset Only.
Many Georgia congregations are not Georgia Power customers. The Georgia Public Service Commission lists 41 electric membership corporations (EMCs) and 52 municipal electric systems. Georgia Power serves about 2.7 million customers in 155 of the state's 159 counties, and the PSC has only limited authority over EMCs. If your bill comes from an EMC or a city utility, ask it in writing for its current solar buy-back and interconnection rules. Our step-by-step guide to commercial solar interconnection in Georgia covers the application process.
Does solar pay off for a typical Georgia church? A worked example
It can, slowly, and a 30% elective payment cuts the simple payback time by about 30%. Illustrative assumptions, not a quote or project data: a 12,500 sq ft building using 4.9 kWh/sq ft (61,250 kWh a year, EIA CBECS 2018 averages); a 30 kW-dc roof array; 1,364 kWh per kW-dc per year from our NREL PVWatts v8 run for Macon, Georgia (10° tilt, south-facing, 14% losses, run November 25, 2026; PVWatts could not be reached today, so we reused that run). That gives about 40,900 kWh a year, roughly 67% of the building's annual use. Energy used on site is valued at Georgia's 2024 average commercial price of 10.87 cents/kWh (EIA, Table 4); exports at Georgia Power's listed 3.3153 + 4 = 7.32 cents/kWh.
Share of solar used on site (%) | Year-1 bill value (USD) | Average value per solar kWh (cents) | Simple payback at $3.00/W, no credit (years) | Simple payback at $3.00/W, 30% elective pay (years) |
30 | 3,429 | 8.38 | 26.2 | 18.4 |
50 | 3,720 | 9.09 | 24.2 | 16.9 |
70 | 4,011 | 9.80 | 22.4 | 15.7 |
The $3.00/W installed price is an assumption for the calculation, not a market price; use the figure in your own quotes. Across $2.50 to $3.50/W, simple payback ran from 13.1 to 21.4 years with a 30% elective payment and 18.7 to 30.6 years without it. A $90,000 system at $3.00/W would receive about $27,000 back through elective pay after the return is filed, so the organization still has to fund the full cost first.
PPA test: in this example each solar kWh is worth 8.38 to 9.80 cents to the church. A PPA priced above that from year one, or with an escalator that pushes it there, costs more than it saves. Ask any PPA or lease provider to show its price against your actual rate schedule, not a statewide average.
What should a Georgia church board check before signing?
Most of the risk sits in assumptions, not in the panels. Ask for each of these in writing:
Deadline plan: the date the system will be placed in service, and what happens if it slips past December 31, 2027.
Who claims the credit: the organization (elective pay) or the financier, and the price with and without it.
Utility rules: your own utility's buy-back rate, size limits and interconnection steps, from Georgia Power, your EMC or your city.
Roof life: remaining roof life, and who pays to remove and reinstall the array if the roof is replaced.
Load data: a production estimate compared with 12 months of your bills, including weekday versus weekend use.
Contract terms: for leases and PPAs, the escalator, term, buyout schedule and what happens if the building is sold.
Governance: board or denominational approval, and whether property owned by a diocese or conference needs its consent.
FAQ
Can churches use elective pay for solar?
IRS Publication 6045 lists religious organizations among the tax-exempt entities that can use the investment credit, and Publication 5817-D says organizations described in Code sections 501 through 530 can make the election. Registration and a filed Form 990-T are required. Confirm your organization's status with a tax professional.
Is it too late for a Georgia church to get the solar credit?
Not yet. A solar project whose construction begins after July 4, 2026 must be placed in service by the end of 2027, according to the IRS Form 3468 instructions. Projects that slip past that date lose the Section 48E credit.
Is a PPA or buying better for a Georgia nonprofit?
It depends on cash and the deadline. Buying, with elective pay, keeps the credit and all future savings but needs upfront funds. A PPA needs little or no money upfront but only saves if its price per kWh stays below what each solar kWh is worth on your bill.
Does my EMC have to accept a church solar system?
Georgia's Solar Power Free-Market Financing Act covers all electric service providers, including EMCs and city utilities, but each utility sets its own buy-back credit and interconnection process. Ask your EMC for its current written rules.
Assumptions and limits
The worked example uses national CBECS averages for building size and electricity use, a single PVWatts run for Macon reused from an earlier post, a statewide average commercial price rather than a specific rate schedule, and Georgia Power's listed 2025 export rate, which may be updated. It ignores demand charges, fixed charges, degradation, O&M, insurance, roof work and financing costs. This is not tax, legal, financial, structural or electrical advice. Any system needs utility approval, local permits and a licensed contractor, and incentives must be confirmed with a tax professional.
More Georgia solar analysis
Read our guides to solar leases and PPAs in Georgia, commercial solar interconnection in Georgia and why capacity factor isn't a savings estimate, or browse all our Going Solar posts.
Sources
IRS, Publication 6045, Tax-Exempt Entities and the Investment Tax Credit (Rev. 10-2026), accessed November 27, 2026.
IRS, Publication 5817-D, Elective pay for tax-exempt organizations (Rev. 4-2024), accessed November 27, 2026.
IRS, Instructions for Form 3468 (2025), accessed November 27, 2026.
Georgia Power, Commercial rooftop solar FAQs, accessed November 27, 2026.
Georgia Public Service Commission, Electric utilities, accessed November 27, 2026.
O.C.G.A. § 46-3-62, Definitions (FindLaw), accessed November 27, 2026.
U.S. EIA, CBECS 2018, Table C22 and Religious worship building profile.
U.S. EIA, 2024 Average Retail Price by State and Sector (Table 4).
NREL PVWatts v8, Macon, GA run of November 25, 2026, as published in our capacity factor guide.
Fact-checked November 27, 2026.